Category Construction

06 Dec

Southern California Edison Charge Ready Project

Location: Port of Long Beach (POLB) Timeline: 12/13/2018 – 06/14/2019 Description: Doty Bros. Construction installed 6 – 10’x12’ slab boxes, 5 – 8’x10’ PMEs, 3 – 66”x72” pads, 125 – 16’x12” barrier posts, 10 – 11’x8” barrier posts, excavated 990’ of trench, excavated and poured 58’ of 24”x30” of cable trench, and directional bored 490’

Read More
28 Jan

Firewater System Upgrade

Location: Blythe, CA Timeline: May 2019 to July 2019 Construction Methods: Installation of Steel Pipe SCOPE: – Fabricate 1.5”, 8”, and 10” steel piping – approx. 3,500 ft – Excavate install 4” PVC piping and retention basin – Excavate install 800’ of 2” sump discharge piping – Excavate install 80’ of 8” water line loop

Read More
16 Jan

Southern California Edison Solar Farm Substations

Location: Kern County, CA Timeline: 2016 Description: In 2016, Doty Bros. Construction installed footings for 5 new solar farm substations. This included rough grading, setting form boards, placing rebar, and pouring concrete. Once the footings were poured, soil was brought back up to the original grade, compacted, and rock was spread across the surface.

Read More
16 Jan

Southern California Edison Metro West Civil Source Contract

Location: Southern California Edison’s Metro West Region Timeline: January 2016 – December 2018 Description: Doty Bros. Construction Company was the sole civil source contractor for Southern California Edison’s Metro West Region from January 2016 to December 2018. Through this contract, Doty Bros. completed more than 2,000 projects a year consisting of projects ranging from small,

Read More