06 Dec

Location: Port of Long Beach (POLB)

Timeline: 12/13/2018 – 06/14/2019

Description:

Doty Bros. Construction installed 6 – 10’x12’ slab boxes, 5 – 8’x10’ PMEs, 3 – 66”x72” pads, 125 – 16’x12” barrier posts, 10 – 11’x8” barrier posts, excavated 990’ of trench, excavated and poured 58’ of 24”x30” of cable trench, and directional bored 490’ of 2 – 5” conduit for the Southern California Edison Charge Ready Program. One of the biggest challenges faced during this project was coordinating container shipments with the POLB and scheduling work accordingly. By being in constant communication with the Port, the project was completed on time and without delaying activities within the POLB.

Share