16 Jan

LOCATION: Whitewater, CA

Timeline: 2018

Description:

In 2018, Doty Bros. performed phase 1 of a redesign for a 36” pressure limiting station which involved excavating around existing lines, upgrading the existing piping and valves, installing underground pipe supports, electrical components and instrumentation. After this was completed a backfill was performed along with regrading the area.

Share